Canonsburg, Pennsylvania -
Based in Pennsylvania, CDMG is a global leader in the steel construction industry. The PA-based steel building erector explains how easy it is to expand a pre-engineered metal building. “Steel building additions are cost-effective and easy to implement,” says Thomas Corry, metal building division manager. The leading Pennsylvania metal building erector states that all steel buildings are expandable, allowing a business to start small and upgrade as it grows.
To read the full article, click on the link: https://www.cdmg.com/building-faqs/add-on-to-a-metal-building
Pre-engineered metal buildings, states CDMG, are highly durable and can withstand the vagaries of weather, adding that budget-friendly steel buildings are the most reliable construction materials available. These are many of the reasons that metal buildings are perfect for aviation hangars, distribution warehouses, or recreational facilities. According to the top metal building construction company, steel is available in different color & roof designs and dimension possibilities.
CDMG uses top-grade Nucor steel, which is fire and pest resistant. The PA metal construction company emphasizes on location, land, and local considerations for considering expansion of a metal building. If the location is quite appealing, there is no harm in expanding the steel unit. Another factor on the CDMG list is the availability of land. The steel building erector asks, “Do you own enough land for your add-on, and if not, can you acquire the land you need? If you answer no to any of those questions, it will be difficult to expand your current business. But if you have the necessary land, a metal building expansion will be pretty straightforward.”
The Pennsylvania steel building supplier stresses the importance of getting local building permits for addition or expansion from the local zoning and planning commission to ensure there are no restrictions for extensions.
The top metal builder says that expansion is a cost-effective way to make a building bigger. The higher the roofline, the wider the expansion of the lean-to and addition of more bays. “To open the bay and keep your space open, all you have to do is remove the wall panels and some girts.” With the new roofing and end walls, the job is done.
CDMG explains the difference between adding length and adding width. The top PA steel building supplier notes that the new addition cannot be directly added to the original frame in a post and beam construction. “You have to start as an entirely new end wall that's placed right next to the end wall of your existing building.”
CDMG explains how a building can be expanded by the addition of extra bays to the back, suggesting getting the job done by experts with experience in specialty framing techniques.
CDMG suggests removing or shoring up girts and purlins for buildings without an appropriate moment-resistant frame and adding a new spanning moment-resistant frame.
Those looking to expand their metal building with the best PA metal building supplier should contact CDMG via their website. CDMG leverages top-grade, recyclable steel and construction steel building components ready to assemble for quick erection of the prefabricated steel building at the client’s site.
https://www.youtube.com/embed/-Rte_S6tm0Q
From our Southpointe office in Canonsburg, Pennsylvania (20 miles south of Pittsburgh), CDMG serves the engineering and project/construction management needs of customers nationwide.
Southpointe Industrial Park
150 Technology Drive
Canonsburg, PA 15317
April 09, 2024 – CDMG Metal Buildings Champions Automation in Construction, Paving Way for Industry Evolution
March 07, 2024 – CDMG Explains Why Engineering Is Important For Groundbreaking Architecture
January 03, 2024 – CDMG Discusses the Uses of Crane Buildings
October 30, 2023 – CDMG Metal Buildings: Why Your Next Investment Should Be A Pre Engineered Metal Building
September 18, 2023 – CDMG Metal Buildings Explains the Benefits of Using Pre Engineered Metal Buildings
July 06, 2023 – CDMG Details Advantages Of Construction Management
March 13, 2023 – CDMG Metal Buildings Explains the Reasons Manufacturing Facilities Use Pre-Engineered Metal Buildings in New Blog Post
January 05, 2023 – CDMG Builds Top Pre-Engineered Metal Buildings For Aircraft Hangars
November 29, 2022 – CDMG Metal Buildings Explains How to Design an Airplane Hangar Using a Pre-Engineered Metal Building
September 16, 2022 – CDMG Discusses How To Find The Right Metal Building Supplier